Woods Creek Area Construction Update (from Public Works):

Last week, crews paved the parking lot at Ted Spella Park as well as placed the final asphalt surface on Fairway View Drive. Crews also completed various sidewalk repairs throughout the project area and relocated the sheet pilings from the west walls to the east side. These pilings will protect the construction area and creek bed from unstable soil conditions.

This week, crews will return to paving the multi-use path from Woods Creek Lane to Bunker Hill Drive and will begin building the east abutment (support wall) structure. Residents will also see crews regrading (leveling) the creek bed that flows under the new bridge.

If You See Something, Say Something! The construction site has experienced several acts of vandalism lately. Vandalism slows progress and requires the team to redo work. Please notify the police If you see any suspicious or destructive activity.

Road/Path Closure Alert

The multi-use path is closed from Woods Creek Lane to Bunker Hill Drive. Also, Woods Creek Lane is closed due to construction on the bridge-like structure over the creek.

As a reminder, homeowners who have invisible dog fences or sprinklers installed on the public right-of-way will be responsible for any repairs to those items. The Village will not reimburse homeowners for any repairs for personal property installed within the public right-of-way. http://terracehillproject.org/index.html