Sewer Work Update (from Public Works)

Last week, crews completed the installation of the mainline sewer along North Harrison Street as well as the remainder of the sanitary service connections. These components of the project are now complete!

This week, weather permitting, crews will continue installing the storm sewer along North Harrison Street. This work will take place at various locations between Sunny Drive to north of Brook Street. Please allow extra time while traveling during working hours; residents may need to follow the Stage 2 detour depending on the location of the construction zone.

This week, crews will also be decommissioning and removing the existing lift station, which pumped sewage from low elevation to higher elevation, located in the 900 block of North Harrison Street. The lift station is being removed because the new sewer has been installed deeper, which allows the wastewater to be conveyed by gravity instead of having to be pumped. The lift station will not be replaced.

A special property access notice:
All residents south of Fox 14 Marina should access their properties from Front Street or Algonquin Road, including properties along Park Street, Brook Street, Riverview Drive and Fox 14 Marina.
All residents north of Fox 14 Marina should continue to follow the detour and access their properties from Blackhawk Trail.
Please be advised that while crews are working on storm sewer replacement, residents within the work area may need to follow the Stage 2 detour temporarily during working hours. Residents will have full access during off hours.

*Fox 14 Marina is open during construction and accessible from the north, off Blackhawk Trail.